In response to the questions addressed to Geoteam

In response to the questions addressed to Geoteam



During the last 8 years Geoteam CJSC has held 11 public hearings and more than
170 meetings with the communities. Taking into consideration the fact that the
Amulsar mine is not being operated yet, the number of such community meetings
is unprecedented. During these 8 years representatives of the affected
communities have been provided with the details of the Project, issues have
been discussed and responses given to any question raised. We have achieved an
atomosphere of mutual trust and continuous open communication with the
communities.



Nevertheless, even if one community resident is not satisfied with the answers
to his/her questions, we are happy to discuss the questions addressed to us in
the form of the open letter sent on March 12th.



Below is the brief content of the questions and the answers of the Company
specialists:


1.  Since 2011
the location of the heap leach facility has changed three times. “…What
advantages does the selected area have as compared to the first two; whether
the ecological, health and environmental risks are smaller or greater, since
the area is closer to the communities than the previous ones”.

 


First of all, we would like to remind that about 600 heap
leach facilities are operating all over the world, including in the USA,
Canada, Australia, Chile, Russia, etc. Some of them are adjacent to
communities, forests, and water resources. The Amulsar HLF will be a modern
facility, subject to current best-practice design principles.



A geotechnical survey is carried out before selecting a location for the heap
leach pad, and if the area meets stability, safety, and other technical
criteria, it is deemed suitable. In this respect, two former locations selected
in 2011 and 2013 were not significantly better or worse as compared with the
current location.



According to the specialists and independent experts, the pad could operate
safely for the environment in either the two former locations or the currently
selected one.



However, two amendments were made in the Armenian legislation during the last 3
years. According to the first amendment, the immediate impact zone of Lake
Sevan was extended in 2012 to cover the area where the heap leach facility was
planned at the time, prohibiting ore processing in this area. And according to
the second amendment, a 3 km
buffer zone was set in 2013 around the inactive Spandaryan-Kechut tunnel, and
this area was also considered as part of the Lake Sevan immediate impact zone.



Irrespective of our belief that both the first and second locations would have
ensured safe operation of the pad from environmental, health or other
viewpoints, to stay compliant with the Armenian legislation the Company has
changed the pad location.



The new location was selected as a result of the two-month activity of the
joint working group with the RA Government.



Furthermore, the Company has invested significant funds and 5 years of work to
identify the environmental risks not only of the pad, but also all the
infrastructre of the Amulsar mine, and to design the mechanisms of their
management, involving about 50 international and national specialists and
organizations, which is unprecedented for Armenia and also exemplary in
complying with international standards.


2.  “Which
international standards envisage building the cyanide pad 500m far from the
community, within the newly planted orchards of Gndevaz, if it is
internationally accepted that such facilities should be 30 km far from the
settlements?”:




We would be happy to familiarize ourselves with any regulatory document,
according to which “it is internationally accepted that such facilities should
be 30 km
far from the settlements”.



We and numerous international experts who have worked on the Project are not
familiar with any international standard which sets such a limited zone around
the heap leach pad. As we have already mentioned, as long as the pad is
properly managed and complies with technical requirements, it can operate
safely in the neighbourhood of settlements.



In 2013 we visited the USA with the mayors of Gndevaz, Gorayk and Saravan and
visited the Cripple Creek and Victor mines, where various infrastructure,
including the heap leach facility, are 500m from the town of Victor and 900m
from Cripple Creek. There are many other such examples.



The Amulsar pad will be 1 km
away from the nearest community, Gndevaz, and at a considerably lower
elevation.



Finally, Geoteam employees have been working closely with the inhabitants of
the adjacent communities for 8 years, having established warm and friendly
relationships with them. Most of our employees - engineers, geologists, social
and environmental specialists - spend a considerable part of their working time
at the communities and Amulsar. The safety of the communities and our staff is
top priority for us, and we are working to assure this in the Project.



3.    “You plan to use
2,000 tons of sodium cyanide per year. 4 million tons of solution will be
obtained for preparing a solution with 500 mg/l concentration. You will pour
out this 4 million tons in a year on the heap leach pad with an area of 134 ha and you plan to
develop 2 ponds: collection ponds (with 200,000 m3 capacity) and
HLF storm event ponds (with 170,000
m3 capacity). We would like you to explain what ecological
calamity may be caused to Vayots Dzor by the 3.63 Mt cyanide solution and
waters in 134 ha
HLF area polluted by million tons of heavy metals, cyanide, hydrochloric acid
from rainfalls and snowmelt, flowing into the Arpa River, as a matter of fact,
all the villages irrigate the fields by the waters of Arpa”.



The heap leach is a closed cycle facility and there will be no industrial
discharge to the Arpa River or any other environmental receptor.



Cyanide is used to extract gold from the ore stacked on the heap leach pad,
which is designed to ensure there are no releases, thus preventing the
possibility of both environmental and economic lossess.



The calculations of the author of the letter regarding the 3.63 Mt of cyanide
solution is likely a result of misunderstanding. As mentioned in many sections
of the EIA report, the cyanide solution will be supplied by a closed
circulation system. This means that at a given period there will be 415-470 m3 circulating diluted
cyanide solution in the pad, with about 230kg cyanide dissolved in
approximately 460t water, which will be pumped back to the process without any
emission. The cyanide and water content will be refreshed periodically, as the
cyanide decays during the production process.



Now as for “million tons” of heavy metals: the metals to be extracted from the
ore are the gold and silver, and the overall content does not exceed 350 tons
of metal over the life of the mine. As for other metals, the ore naturally
contains only trace concentrations. The concentration of the traces of metals
in the ore in heap leach will not be more than it was in the rock naturally.
Once again, the heap leaching is a closed circuit and neither the gold or
silver nor the trace amounts of other metals will discharge into the environment.
After the mine closure the heap leach will be rinsed for 12 months, cleaned
from cyanide, drained down, covered with clay and topsoiled. 



As for the snowmelt and rainfalls, again there will be zero discharge of
process waters into the Rivers Arpa and Vorotan or other natural environment.
The Surface Water Management Plan is summarized in Section 5.2.5 of the EIA and
Appendix 16. The third pond out of those mentioned will be empty and will have
170 000m3 capacity. It is designed to collect storm event waters. All surface
waters related to the production process will be collected by the drainage
system and pumped back to the production process, as it is done in hundreds of
modern mines in the world. Additional drainage will be built underneath the pad
to collect snowmelt waters.



4. “Acquiring the lands for the heap
leach facility and other infrastructures you will destroy the orchards and
fields there. You are requested to make clear is it possible to use or sell to
you as food the crops from the orchards and gardens several dozen meters far
from that area.”



The majority of the orchards in Gndevaz are outside the land areas to be
acquired by the Company. The areas to be acquired for locating the
infrastructure will be demarcated and separated from the community lands. As
already mentioned, the heap leach facility does not have process discharge and
the materials used in the pad will not have any contact with the community
lands.



However, despite all the safety measures in the design, it is natural that some
of the inhabitants may have concerns about the potential impact on the
orchards. Taking into consideration the potential of such concerns, the Company
has undertaken an additional commitment to carry out monitoring of the produce
from adjacent orchards, and to inform all stakeholders of the results.



The studies predict there will be no damage to the orchards adjacent to the
HLF. Nevertheless, if it turns out that there has been any impact, inlcuding
economic loss due to the activities of the Company, then the Company will be
committed to compensate these losses.



Locally produced food will be an important source of supplies for the mine.



5.  “You state that in the heap
leach pad the pH of sodium cyanide should be 11 and more in order to change the
acid to base, and there will be no hydrogen cyanide emission, a small quantity
of which is killing. You are requested to explain how are you going to fulfill
it in 134 ha
area with 4 Mt solution under -30 to +300C temperature, in rain/snow, or what equipment
will be installed on 134 ha
area that 600 kg
will be emitted when 20 tons of cyanide vapours pass through that device and 300 kg from 10t of
hydrochloric acid. In case of fulfilling all this, whether the 4 Mt alkaline
solution and 600 kg
cyanadie, 300 kg
hydrochlorid acid are not hazardous for the local residents and the ecology of
the area.



To wrap-up the discussion of cyanide and to dispel the doubts on the “million
tons” used in Amulsar, we’d like to say that IN TOTAL only 1.1 million tons of
sodium cyanide annually is produced all over the world, with only 6% of this
used in the mining industry worldwide. The remaining 94% is used in production
of metallic (galvanical) materials, chemical fertilizers used in agriculture,
paints, plastic, pharmaceutics, cosmetics and other production.



There is cyanide in nature as well. For example, the kernel of one bitter
almond may contain 6.2 mg cyanic acid. 

The kernels of apricot, apple, peach and more than 1,000 species of plants
contain cyanide (according to the website of the International Cyanide
Management Code).



As already mentioned, there will not be “million tons” of solution. The very
dilute solution (500 mg cyanide in a liter of water, which is 0.05% cyanide) is
circulating; there will be about 460t of solution in circulation at any given
time. The statement on the hydrogen cyanide emissions is also a result of
misunderstanding. The heap leach will not be generating any emissions of
hydrogen cyanide. There is a small risk of hydrogen cyanide emission during the
preparation of the reagents, which takes place in an enclosed facility within
the process plant. As mentioned in Section 5.1 of the EIA, any possible
emissions would be collected by the ultimate air ventilation system, and
filtered in scrubbers. The circulating system in the scrubbers is formed by a
diluted solution of sodium hydroxide, which absorbs vapours of cyanic acid and
hydrochloric acid and neutralizes them. The effectiveness of the scrubbers is
97%. 



Of course, as in the case of other chemical materials used in various
industrial sectors, special safety measures are required for using the cyanide.



The Company has committed to obtaining, transportation, storage and use of
cyanide in compliance with the requirements of the International Cyanide
Management Code.



In accordance with the above Code and the Company’s preliminary Cyanide
Management Plan, the staff working with cyanide in future will receive rigorous
training to ensure safe storage and use of cyanide.



As for the pH, the internationally accepted way to ensure high pH is to add
lime to keep the pH at level of 10.5 and to prevent generation of the hydrogen
cyanide (gas).



As a further precaution, hydrogen cyanide gas detectors will be located at the
cyanide mixing tanks and within the surrounding areas to identify even small
amounts of emissions.



We have grouped the below-mentioned
questions as the presented statements are not always followed by a relevant
question.   



The letter states the fact that the samples analysed by Geoteam contain other
metals, besides gold and silver.  



“(bismuth, cadmium, cobalt, chromium,
copper, ferrum, gallium, molybdenum, nickel, lead, antimony, scandium,
titanium, uranium, strontium, vanadium, zinc and wolfram) and toxic elements
(arsenic, beryllium, thallium, selenium, mercury and cadmium), all of which are
very toxic for human organisms”. 



It is worth reminding that the mining operations at Amulsar have not been
launched yet and current activities will neither increase nor decrease the
metals concentrations in ore or soil within the project area. 

 

Our studies show that the ore, water and soil within the surrounding area
contain certain metals. In the analysed soil samples from the project area,
concentrations of arsenic, lead, cobalt, copper, nickel and antimony are
regularly found to be higher than Armenia’s Maximum Allowable Concentrations.
It indicates that the concentrations of these metals are “naturally” elevated
in the area, as a result of the characteristics of the underlying geological strata
from which the soils are derived.  

 

In addition, the sampling of waters has revealed elevated concentrations of the
above-mentioned metals in the Vorotan, Arpa and Darb rivers. The springs and
tributaries within the area also exhibit low pH, that is they tend to be
acidic.  Groundwater originating from beneath Amulsar is often similarly
elevated in lead, nickel, copper and iron.  Again, these “naturally”
elevated metal concentrations reflect the underlying lithology. The
concentrations of the metals are not expected to increase due to the mining.

 

“In the open pit area of 113.9 ha annually 12088.2
tons of explosives will be used: each well will be charged with 239.6 kg of explosives,
50452 explosions will be carried out, dust emission accounts for  761.56
tons per year and dust will be spread in distance of 100-1000m, noise level
will be almost inaudible in adjacent communities. If the person, who made these
calculations, had been to Amulsar, winds would have blown him off for 100
meters… Emissions in case of mine development will be as follows. 
Inorganic dust – 1185.8 t/y, Nitrogen dioxide – 1365.86 t/y, Carbon monoxide -
1107,75 t/y, Hydrocarbons – 222.4 t/y, Hard particles  - 113.92 t/y,
Sulfur dioxide – 106.35 t/y. We would like you to clarify the ecological impact
in the area and Vorotan-Arpa Tunnel.”



The calculations have been made by international and local specialists who have
been visiting Amulsar and making wind measurements, during different seasons,
within 6 consecutive years and comparing them with Armenian Hydrometeorological
Service data. A dust settlement model has been developed as part of the
environmental studies. According to this model, the dust generated by blasting
will mostly settle within a 100 meters’ radius and the small particles within a
1000 meters’ radius of the open pit. Gorayk, which is the closest community to
the open pit, is located at a distance of 4 km.   

 

Amulsar is not the most challenging deposit in terms of climate. There are a
lot of other projects in the world that are being operated in much more
challenging climatic conditions, including those located in close vicinity of
cities. For example, the Swedish Kiruna deposit that is just adjacent to the
city.



The modern blasting methods make it possible to significantly reduce emissions.



The composition of the dust was estimated from chemical analysis of more than
20,000 samples of ore rock and more than 50,000 samples of barren rock, and
modelling was then undertaken to estimate the resulting concentrations of the
elements in the soil (due to dust settlement) at the end of mine operations.



The element concentrations were then compared with both ecological and human
health screening criteria and were concluded not to present a risk to either
cattle grazing on the soils or to humans drinking milk or eating beef from the
cattle.  



With respect to the impact of blasting on the Vorotan-Arpa tunnel, a
preliminary assessment has indicated that there is no risk.  The tunnel is
3 km
horizontally and 1km vertically removed from the open pits where blasting will
take place, and is in a different geological environment.  



“Barren Rock Storage Facility is located
in the area of 140 ha
in a distance of 5 km
from the open pit and 7 km
from Kechout reservoir, which is located in the drainage basin of Kechout and
Spandaryan reservoirs. Annually around 46.7 million tons of ore and 10 million
tons ore will be transported here, which will be crushed with three crushers
located in a distance of 4.5
km, and then transported via four overland conveyors, on
a 1200mm wide belt, for  7.2 km up to track stucking spot adding thousands
tons of sodium hydroxide. Afterwards 3 trucks of BelAz–7513 make will transport
them to the heap leach facility located in a distance of 1 km. If we spread the crushed
ore in the area of 134 ha,
we will get a layer of 8
meters high...”



To clarify, barren rock is not crushed; it is taken directly from the open pit
to the Barren Rock Storage Facility.  It is the ore that is crushed. The
conveyor will be covered to minimize the dust emission. Lime will be added to
the ore before placement on HLF to neutralize the acidity. 



 “….where you mention that dust
emission of one ton of ore will make up only 1.5 grams after passing
the filters of three crushers, a technology any pharmaceutical plant will be
jealous of.”



The mentioned figures are a reality for many modern mining operations. And this
is how it is done: the primary crusher building, secondary/tertiary crusher
building, and screening building are all enclosed structures, and each building
will be fitted with a separate dust collection system.  Dust hoods will be
placed over the conveyor transfer points and crusher feed points within the
crushing and screening buildings. Thus, emissions will be very low.



Finally, about the economic benefits,
Jermuk, inconsistence of the future mining and agriculture, as well as the
developments, following the mine-closure in 13 years.



Briefly, on figures. The Project is the largest private investment project in
Armenia at the moment. According to preliminary estimates, the Project will
contribute an estimated USD 488 million to the budget of the RA during its
operational life, in the form of taxes and royalties. Another USD 156 million
will be paid as taxes due to operation of other associated small and medium
business entities. The wage fund will make an estimated USD 230 million. The
annual average effect on the overall GDP of Armenia is calculated to make some
USD 120 million. This is a good opportunity for an economic effect, which is
obvious even for a non-economist. It will create many investment opportunities
for community development, agriculture, tourism and other sectors both in
Jermuk and surrounding communities. The efficiency of the funds application,
the strategic investments and the management will depend on the joint efforts
to be taken by all the parties, namely the communities, State authorities,
civil society and, to a certain extent, the company. On the effective
management of the investments within the 13 years will depend the economic
sustainability.          



As to the compatibility of agriculture and mining, this will be possible if
correct management is provided. There are many examples of countries that have
both large agriculture and mining sectors – the US, Australia, Brazil, Canada,
Argentina and Spain among them.    

 

The Amulsar mine closure process is planned to meet all the international
standards. It is worth mentioning that around USD 10 million is stipulated for
the mine closure, including environmental, social and land and water management
plans. 

 

And lastly, we would like to remind that all the above-mentioned figures,
percents and industrial processes descriptions represent a well-tested and
widely used technology.  

 

The lack of trust in mining is easy to understand and the concerns and anxiety
are fully legitimate and appropriate considering the previous experience of
Armenia. 

 

However, there are hundreds of operating mines in the world now and many are
modern and well-managed operations. The mining sector, just like the other
industries, has reported a fast technological growth over the last decades.
Some of the deposits in developed and developing countries apply the
above-mentioned practices and environmentally sound management and provide
economic benefits for the country.       

We believe that it will be possible to achieve the same in Armenia as well.
However, we understand the concerns and are ready to continue the dialogue and
arrange meetings with international experts as requested by the authors of the
letter.


 


https://www.youtube.com/watch?v=C-vqFPE9anY


 


 

POST A COMMENT
Input digits     

News
Armenian leadership deliberately leads Armenian-Russian relations to  collapse - LavrovArmenian leadership deliberately leads Armenian-Russian relations to  collapse - Lavrov
ECHR accepts complaints in cases of Armen Ashotyan and Artur  Danielyan for preliminary proceedings ECHR accepts complaints in cases of Armen Ashotyan and Artur  Danielyan for preliminary proceedings 
Freedom House ranks Artsakh Not Free after Azerbaijani occupation; it  losses 40 points at onceFreedom House ranks Artsakh Not Free after Azerbaijani occupation; it  losses 40 points at once
"Europeans for Artsakh" platform outlines Artsakh`s interests  protecting vector 
Government  allocates about AMD1.4 billion to properly organize 100th  anniversary events of Sergey Parajanov, Charles AznavourGovernment  allocates about AMD1.4 billion to properly organize 100th  anniversary events of Sergey Parajanov, Charles Aznavour
France expresses readiness to consider UFAR`s development and  expansion agenda within Academic City project France expresses readiness to consider UFAR`s development and  expansion agenda within Academic City project 
Armenia to send 30 tons of humanitarian aid to Gaza StripArmenia to send 30 tons of humanitarian aid to Gaza Strip
No No "governments in exile" for Armenia`s premier 
Armenia is turning into extremely dangerous instrument in the hands  of the West - Maria Zakharova Armenia is turning into extremely dangerous instrument in the hands  of the West - Maria Zakharova 
Former Nagorno-Karabakh president calls on France to expert pressure  on Azerbaijan Former Nagorno-Karabakh president calls on France to expert pressure  on Azerbaijan 
Housing programme for forcibly displaced people to be presented next  month - vice-premier Housing programme for forcibly displaced people to be presented next  month - vice-premier 
40+10 assistance programme for forcibly displaced people to be  extended until end 2024 40+10 assistance programme for forcibly displaced people to be  extended until end 2024 
CSTO Sec Gen on Armenia`s participation in CSTO work CSTO Sec Gen on Armenia`s participation in CSTO work 
Meeting in Brussels is to focus on Armenia`s economic resilience -  U.S. Department of State Meeting in Brussels is to focus on Armenia`s economic resilience -  U.S. Department of State 
Upcoming high-level meeting in Brussels not directed against any  third party - Armenia`s foreign office  Upcoming high-level meeting in Brussels not directed against any  third party - Armenia`s foreign office  
World has experience in development of even failed states - Artak  Zakaryan World has experience in development of even failed states - Artak  Zakaryan 
Zakharova: information on Azerbaijan`s arms supplies to Ukraine is  carefully checkedZakharova: information on Azerbaijan`s arms supplies to Ukraine is  carefully checked
Russian Foreign Ministry: France`s actions are hindering  implementation of Azerbaijan-Armenia agreements Russian Foreign Ministry: France`s actions are hindering  implementation of Azerbaijan-Armenia agreements 
Russian Foreign Ministry: Anything that will benefit the people of  Armenia is only welcomedRussian Foreign Ministry: Anything that will benefit the people of  Armenia is only welcomed
Gnel Sanosyan: Upon completion of demarcation and delimitation  process, there will be no unresolved problemsGnel Sanosyan: Upon completion of demarcation and delimitation  process, there will be no unresolved problems
Statements by Alen Simonyan are carte blanche for aggression:  Opposition MPStatements by Alen Simonyan are carte blanche for aggression:  Opposition MP
Armenia does not join  CSTO PA delegations heads  statement  condemning violent terrorist attack in Crocus City HallArmenia does not join  CSTO PA delegations heads  statement  condemning violent terrorist attack in Crocus City Hall
NA Speaker: I would like to meet with a person who can prove on a map  that the four villages of Tavush belong to ArmeniaNA Speaker: I would like to meet with a person who can prove on a map  that the four villages of Tavush belong to Armenia
National Assembly Speaker: there were no political overtones in my  meeting with Svetlana TikhanovskayaNational Assembly Speaker: there were no political overtones in my  meeting with Svetlana Tikhanovskaya
Armenian PM, French parliamentarians discuss processes in South  Caucasus Armenian PM, French parliamentarians discuss processes in South  Caucasus 
Baku irritated by Pashinyan`s upcoming meeting with Blinken and Von  der LeyneBaku irritated by Pashinyan`s upcoming meeting with Blinken and Von  der Leyne
French delegation inspects security in Sotk mine French delegation inspects security in Sotk mine
Offering Armenia EU candidate status makes its pivot to West  irreversible - report Offering Armenia EU candidate status makes its pivot to West  irreversible - report 
AraratBank places its 27th issue of dollar bondsAraratBank places its 27th issue of dollar bonds
Armenian MP meet with Danish counterparts  Armenian MP meet with Danish counterparts  
Surrender of Tavush villages to destroy locals` ecosystem - expert Surrender of Tavush villages to destroy locals` ecosystem - expert 
Renowned Swiss-American lutenist to perform in Armenia  Renowned Swiss-American lutenist to perform in Armenia  
Azerbaijan uses military-political leaders of Artsakh in captivity to  achieve its propaganda goals - statementAzerbaijan uses military-political leaders of Artsakh in captivity to  achieve its propaganda goals - statement
No details of upcoming meeting between Armenia`s premier, U.S. Sec of  State, European Commission president No details of upcoming meeting between Armenia`s premier, U.S. Sec of  State, European Commission president 
People of Nagorno-Karabakh determined to return to their homeland -  Leevon KocharyanPeople of Nagorno-Karabakh determined to return to their homeland -  Leevon Kocharyan
Armenian committed to peace and stability in South Caucasus Armenian committed to peace and stability in South Caucasus 
Tatoyan Foundation, together with other human rights organizations,  publishes joint report on torture committed by Azerbaijan against  ArmeniansTatoyan Foundation, together with other human rights organizations,  publishes joint report on torture committed by Azerbaijan against  Armenians
Mirzoyan: Armenia considers Argentina as reliable partner in South  AmericaMirzoyan: Armenia considers Argentina as reliable partner in South  America
French Ambassador: The right of Artsakh people to return to their  homeland has been violatedFrench Ambassador: The right of Artsakh people to return to their  homeland has been violated
State Dept on US policy principles in relations with ArmeniaState Dept on US policy principles in relations with Armenia
Slander aimed at removing National Democratic Pole from political  arena: party responds to IC Slander aimed at removing National Democratic Pole from political  arena: party responds to IC 
Armenian diplomat to EU special rep: Aliyev regime is gearing up for  new aggression against Armenia, as he faced no consequences for last  onesArmenian diplomat to EU special rep: Aliyev regime is gearing up for  new aggression against Armenia, as he faced no consequences for last  ones
ICLaw presents cases of 8 Armenian servicemen to UN Working Group on  Enforced DisappearancesICLaw presents cases of 8 Armenian servicemen to UN Working Group on  Enforced Disappearances
Following Armenian foreign office, references to Artsakh `disappear`  from president`s websiteFollowing Armenian foreign office, references to Artsakh `disappear`  from president`s website
Sati Spivakova and the Moscow Theater of Nations soon in YerevanSati Spivakova and the Moscow Theater of Nations soon in Yerevan
CSTO Secretary General calls for creation of tools to counter  terrorismCSTO Secretary General calls for creation of tools to counter  terrorism
No discussions yet held on the issue of Armenia`s new Constitution -  minister No discussions yet held on the issue of Armenia`s new Constitution -  minister 
Establishment of lasting peace and stability in South Caucasus  Armenia`s top priority - Nikol Pashinyan Establishment of lasting peace and stability in South Caucasus  Armenia`s top priority - Nikol Pashinyan 
Azerbaijan should end the intimidation and harassment of journalists  and civil society activists - Dunja MijatovicAzerbaijan should end the intimidation and harassment of journalists  and civil society activists - Dunja Mijatovic
Armenia`s minister of justice on reforms in judicial system Armenia`s minister of justice on reforms in judicial system 
Armenian expert on Azerbaijan`s policy of misappropriation of  Armenian heritage Armenian expert on Azerbaijan`s policy of misappropriation of  Armenian heritage 
Incident with ex-minister of defense followed by numerous dismissals  - minister Incident with ex-minister of defense followed by numerous dismissals  - minister 
Russia is going through a rather difficult period in relations with  friendly, fraternal Armenia - Russian presidential spokesman Russia is going through a rather difficult period in relations with  friendly, fraternal Armenia - Russian presidential spokesman 
Azerbaijan creates artificial grounds for military aggression against  Armenia - Arman Tatoyan Azerbaijan creates artificial grounds for military aggression against  Armenia - Arman Tatoyan 
Armenian FM takes part in presentation of book Armenian FM takes part in presentation of book "Armenian Buenos  Aires" 
Threats against Armenia in Azerbaijani media channels unacceptable -  Toivo KlaarThreats against Armenia in Azerbaijani media channels unacceptable -  Toivo Klaar
Opposition MP: Threatening people with war is not the mission of  country`s leaderOpposition MP: Threatening people with war is not the mission of  country`s leader
Roundtable on geopolitical developments in South Caucasus held at  Belgian SenateRoundtable on geopolitical developments in South Caucasus held at  Belgian Senate
Andranik Tevanyan: Political struggle is the only guarantee of  success, a chance not to turn real Armenia into historical oneAndranik Tevanyan: Political struggle is the only guarantee of  success, a chance not to turn real Armenia into historical one
Vahagn Khachaturyan Vahagn Khachaturyan "closes" book of condolences at Russian Embassy  in Yerevan
Read more



Commented